Commercial Buildings

Commercial Buildings
Beijing Jingdong Group
Beijing ByteDance
Poly International Plaza Beijing
Beijing Daxing International Airport
Phase Ⅱ Haikou Meilan International Airport
Changchun Longjia International Airport Phase Ⅱ

Beijing Jingdong Group

Project background:

2017-2018:Jingdong Beijing Headquarter Renovation Project was located in Beijing Economic-Technological Development Area with a total area of 280,000 square meters. In 2020, JD built Building 4 (R&D Center) with a construction area of over 130000 square meters, and No.2 Building covers a floor space of 530,000 square meters, which makes it the largest headquarters park of Jingdong

Product application:

Taloar continued to provide a number of projects in Jingdong Group's headquarters park with high-quality fluid control solutions and products such as butterfly valves, balancing valves, check valves, globe valves, strainers, gate valves, etc., which provided good guarantee for the normal operation of the system.

Beijing ByteDance

Project background:

Located at No. A48 Zhichun Road, Haidian District, Beijing, the headquarter of ByteDance covers an area of about 23,000 square meters with four floors above the ground and three floors underground.

Product application:

In this project, Taloar provided a series of fluid control products such as balancing valves, pressure differential valves, electric valves and automatic balancing electric valve for the HVAC system, which perfectly solved the problem of hydraulic imbalance, saved energy, and brought a comfortable environmental experience for the users.

Poly International Plaza Beijing

Project background:

Personally created by the designer of Burj Dubai, Poly International Plaza Beijing, with a total construction area of 116,000 square meters, consisting of three iconic landmark buildings that are on par with international standard, is a hub of enterprise headquarters offices, super 5A office buildings, and global city business centers. It will become the first landmark building, when people visit Beijing in the future.

Product application:

In this project, Taloar provided butterfly valves, gate valves, strainers, silent check valves, pressure relief valves, pressure reducing valves and other series of products for the water supply and drainage system, which secured the normal operation of the project.

Beijing Daxing International Airport

Project background:

Beijing Daxing International Airport, located between Yufa and Lixian towns in Daxing District, Beijing, and Guangyang District, Langfang City, Hebei Province, with a terminal area of 780,000 square meters, is a Class IV international airport, a multinational aviation hub, and a new power source for national development.

Product application:

In this project, Taloar provided motorized control valves, electric butterfly valves, hydraulic balancing valves, pressure differential valves , butterfly valves, check valves, strainers and other series of products, whose performance all reached the requirements of the customers. These products can save energy, while reducing energy consumption and bringing a comfortable environmental experience for the users.

Phase Ⅱ Haikou Meilan International Airport

Project background:

Located in Haikou City, Hainan Province, China, Phase Ⅱ Haikou Meilan International Airport Expansion Project, 18 kilometers southeast of the city, with a total investment of 14.468 billion yuan, the new flight area class index of 4F and a total floor area of about 300,000 square meters, will become a strategic hub for the construction of Hainan Free Trade Port and the construction of a strong civil aviation in multiple areas.

Product application:

In this project, Taloar provided a series of products such as balancing valves, pressure differential valves, motorized valves, proportional integral control valves, etc., which perfectly solved the problem of hydraulic imbalance in air-conditioning system and created an energy-saving and comfortable indoor environment for users.

Changchun Longjia International Airport Phase Ⅱ

Project background:

Located on the east side of the existing T1 Terminal Building, Changchun Longjia International Airport Phase Ⅱ Expansion Project was arranged in parallel with the airport approach path, with a total construction area of 1,720,000 square meters. The project applied the overall streamlined design,which looked like a flying crane. It not only enhanced the service and security capacity and level of Changchun Airport, but also won the praise of Chinese and foreign travelers.

Product application:

In this project, Taloar provided a series of shut-off control valves such as gate valves, globe valves, silent check valves, gate valves, ball valves, etc. to ensure the operation of the project.

Beijing Jingdong Group

Beijing Jingdong Group

Beijing ByteDance

Beijing ByteDance

Poly International Plaza Beijing

Poly International Plaza Beijing

Beijing Daxing International Airport

Beijing Daxing International Airport

Phase Ⅱ Haikou Meilan International Airport

Phase Ⅱ Haikou Meilan International Airport

Changchun Longjia International Airport Phase Ⅱ

Changchun Longjia International Airport Phase Ⅱ

Copyright © TALOAR All Rights Reserved