Project background:
SDIC Tianjin Beijiang Power Plant is located in Yingcheng Town, Hangu District, and is one of the first pilot units of national circular economy. The Phase I project of Tianjin Beijiang Power Plant will construct 2 × 1000MW power generation units and a 200000 tons/ day seawater desalination device. The first unit has been put into operation on September 24, 2009, and is the first million- kilowatt supercritical power generation unit put into operation in the north of the Yellow River in China. Its seawater desalination device is a large-scale seawater desalination project in China at present.
Product application:
Taloar provides a series of products, including metal sealed bi-directional triple eccentric butterfly valves and fully welded ball valves for the primary heating pipeline network of the project, with a maximum size to 56 inches. The valves are better shut-off and control valves for centralized heating, refrigeration, and remote crude oil transportation pipelines.